Toolbench/BuildCalc
All 49 suites
Type it in plain English · metric · with materials and cost

Describe the job. Get the materials.

Skip the forms. Write what you are doing the way you would say it, and get tile counts, adhesive, grout, waste and an estimated cost — then fine-tune in the detailed calculator.

⚡ Smart estimate

Type your job — area, tile size, waste, price. It understands most ways of writing it.

Detailed calculators

Why most tile calculators give you the wrong number

Ask a typical online calculator how many 60 × 60 tiles cover 120 m² and it divides 120 by 0.36 and tells you 334. That is wrong in two directions at once, and the errors do not cancel.

First, it ignores the joint. A 60 × 60 tile with a 3 mm grout line occupies 60.3 × 60.3 cm on the floor, which is 0.3636 m², not 0.36. Over 120 m² that difference is four tiles. Second — and much more importantly — it stops at the tiles. You cannot lay a floor with tiles alone. That job also needs roughly 23 bags of adhesive and 4 bags of grout, and if you arrive on site without them the tiles are useless.

The full answer for 120 m², 60×60 tiles, 8% waste

  • 357 tiles — 330 to cover the floor, 27 for cuts and breakage
  • 129.6 m² of tile purchased for a 120 m² floor
  • 23 bags of adhesive (25 kg) at a 10 mm notched trowel
  • 4 bags of grout (5 kg) — 19.2 kg at 0.16 kg per m²
  • 1,428 spacers

How the consumables are worked out

Adhesive follows the trowel, and the trowel follows the tile

Adhesive is not a fixed rate per square metre. It depends on the notched trowel you use, and the trowel depends on tile size — a bigger tile needs a deeper bed to bridge substrate variation. Typical figures are 2.6 kg/m² at a 6 mm notch, 3.4 at 8 mm, 4.3 at 10 mm and 5.1 at 12 mm. Above 60 cm the tile should also be back-buttered, which adds roughly half as much again. That is why a large-format floor can use nearly three times the adhesive of a small-tile floor over the same area.

Grout follows the joint length, not the area

The standard formula is:

kg/m² = ((L + W) ÷ (L × W)) × thickness × joint width × density

with tile dimensions in millimetres and grout density around 1.6. For 600 × 600 tiles, 10 mm thick, with 3 mm joints, that gives 0.16 kg/m². Now try 100 × 100 mosaic at the same joint width: 0.77 kg/m² — nearly five times more, because small tiles pack far more joint length into each square metre. This is the calculation people most often guess at, and guessing is why grout either runs out mid-job or sits unopened for years.

Choosing a waste percentage

SituationTypical allowance
Straight layout, simple rectangular room10%
Small room with many cuts12–15%
Diagonal layout15%
Herringbone or complex pattern15–20%
Large format tiles (offcuts rarely reusable)12–15%

Whatever figure you use, buy the spare tiles in the same batch. Tile shade varies between production runs, and a repair two years later with a different batch is visible from across the room.

What these numbers are and are not

The consumption rates here are typical industry figures, not manufacturer data. Real coverage varies with substrate flatness, trowel technique, ambient temperature and the specific product. Always check the datasheet on the bag you actually buy, and treat these results as a purchasing plan to verify rather than a guarantee. Costs are whatever prices you enter — there is no price database behind this site.

◼️ Tile Calculator

Tiles, adhesive, grout, spacers and cost — the whole materials list.

How the tile count is calculated

Each tile occupies its own size plus one joint width in each direction. A 600 × 600 mm tile with a 3 mm joint takes up 603 × 603 mm, or 0.3636 m². Dividing the floor area by that figure gives the tiles needed to cover the surface; the waste percentage is then added on top for cuts, breakage and future repairs.

Adhesive

The trowel notch sets the bed depth and therefore the consumption. This calculator selects the notch automatically from tile size — 6 mm up to 20 cm tiles, 8 mm to 40 cm, 10 mm to 60 cm and 12 mm beyond — and applies the matching consumption rate. Tiles larger than 60 cm are also assumed to be back-buttered, adding 50%, which is standard practice for large format and effectively required for full-bed coverage.

Grout

Grout is calculated from joint geometry, not from area. The formula multiplies the joint length per square metre by the joint cross-section, so tile size, tile thickness and joint width all matter. Halving the tile size roughly doubles the grout needed. Widening the joint from 3 mm to 6 mm doubles it again.

Related

🧱 Concrete Calculator

Cubic metres, bags, and the cement, sand and aggregate split.

Ready-mix or mix on site?

Volume is straightforward — length × width × thickness — but the decision that follows is not. Ready-mix is sold by the cubic metre and almost always has a minimum order, typically around one cubic metre. Bagged concrete makes sense for small pours: post holes, a few footings, a shed base. Once you pass roughly 1.5 m³ the bag count becomes punishing, both in cost and in mixing time.

A 7.5 m³ slab needs about 459 bags of 40 kg. Nobody mixes that by hand. At that volume ready-mix is cheaper and finishes in an hour rather than a weekend.

The 1:2:4 breakdown

If you are batching on site, the calculator shows a 1:2:4 mix by volume — one part cement, two sand, four aggregate — with a 1.54 bulking factor applied, because dry materials compact when water is added. That is a general-purpose mix suitable for slabs and footings; structural work needs a specified mix design from an engineer, not a rule of thumb.

Related

🎨 Paint Calculator

Litres by coat, with doors and windows deducted.

Spread rate is the number that matters

Coverage varies more than people expect. Smooth previously-painted plaster might give 12–14 m² per litre. Fresh plaster, textured surfaces or porous masonry can drop to 6–8. The figure printed on the tin is a best case measured on ideal substrate, so if you are painting anything absorbent, reduce it.

The first coat on bare or repaired plaster always drinks more than subsequent coats. If you are painting new work, either add a primer or expect the first coat to cover noticeably less than the tin claims.

Deducting openings

This calculator counts a door as 1.8 m² and a window as 1.5 m². Many decorators deliberately skip these deductions on small jobs, on the grounds that cutting in around frames uses the paint you saved. For a room with a large picture window the deduction is worth making.

Related

🪵 Flooring Calculator

Packs to buy, underlay and skirting.

You buy packs, not square metres

Flooring is sold in sealed packs covering a fixed area, so the practical answer is always a whole number of packs. A 20 m² room with 10% waste needs 22 m², and at 2.2 m² per pack that is exactly 10 packs. Change the room to 21 m² and you need 11 packs — you have just bought 24.2 m² for a 21 m² floor.

Keep the offcuts and any unopened pack. Batch shading varies, and a discontinued range means a single damaged board can force relaying an entire area.

Direction and waste

Laying boards along the longest wall usually produces less waste and looks better in a rectangular room. Diagonal layouts and rooms with alcoves, thresholds or angled walls push waste well above 10% — budget 15% and buy it all at once.

Related

🧊 Drywall Calculator

Boards, framing, screws, tape and compound.

Boards are the easy part

Board count is simple division. What catches people out is everything else: the framing behind it, and the jointing materials in front. A typical wall needs roughly 30 screws per board, 1.5 m of tape per square metre, and around 1.2 kg of jointing compound per square metre across all coats.

That compound figure surprises people — 80 m² of wall needs about 96 kg, or five 20 kg bags. Running out halfway through a taping session, with joints partly filled and drying at different rates, is a genuinely annoying way to lose a day.

Board size

Longer boards mean fewer butt joints, and butt joints are the hardest to finish invisibly because there is no tapered edge to bed the tape into. If your ceiling height suits a 2600 or 3000 mm board, the extra handling weight is usually worth the cleaner result.

Related

🏠 Roofing Calculator

Real roof area after pitch, plus underlay and battens.

The roof is bigger than the building

This is the mistake that gets made on almost every first roofing estimate. A 12 × 8 m building has a 96 m² footprint, but at a 30° pitch the roof surface is 111 m² — 15% more material than the plan view suggests. At 45° it is 136 m², over 40% more.

The multiplier is 1 ÷ cos(pitch), or equivalently √(rise² + 12²) ÷ 12 when working in rise-per-12. Whichever form you use, ordering from the footprint leaves you short, and roofing is a bad trade in which to run short with the covering off.

PitchMultiplier96 m² footprint becomes
Flat1.00096 m²
15°1.03599 m²
30°1.155111 m²
45°1.414136 m²
60°2.000192 m²

Note that these figures cover the sloping planes only. Hips, valleys, ridges, verges and any dormers all need their own allowances on top, and complex roofs justify pushing waste well above 10%.

Related

📖 Construction Take-off Guide

How each material is calculated, with worked examples.

1. Tiling: tiles, adhesive and grout

Worked example — 120 m² floor, 600 × 600 mm tiles, 3 mm joints, 8% waste.

  • Tile plus joint footprint: 603 × 603 mm = 0.3636 m²
  • Tiles to cover: 120 ÷ 0.3636 = 330 tiles
  • With 8% waste: 357 tiles (129.6 m² purchased)
  • Trowel for a 600 mm tile: 10 mm notch → 4.3 kg/m²
  • Adhesive: 4.3 × 129.6 = 557 kg = 23 bags of 25 kg
  • Grout: ((600+600) ÷ 360,000) × 10 × 3 × 1.6 = 0.16 kg/m² → 19.2 kg = 4 bags of 5 kg
  • Spacers: 1,428

Change nothing but the tile size to 100 × 100 mm and grout consumption rises to 0.77 kg/m² — from 4 bags to 19. Small tiles are cheap; grouting them is not.

2. Concrete volumes and mixes

Worked example — 10 × 5 m slab at 150 mm. Volume is 7.5 m³; with 10% waste, 8.25 m³. That is 459 bags of 40 kg, which is why anything at this scale goes to ready-mix.

Batching on site at 1:2:4 with a 1.54 bulking factor: dry volume 12.7 m³, giving about 2,614 kg of cement (53 bags of 50 kg), 3.63 m³ of sand and 7.26 m³ of aggregate. Use a specified mix from an engineer for anything structural.

3. Paint coverage

Worked example — 5 × 4 m room, 2.7 m walls, 1 door, 2 windows, 2 coats. Wall area 48.6 m², less 4.8 m² of openings, gives 43.8 m² net. Two coats is 87.6 m² of coverage. At 11 m² per litre that is 7.96 litres, or 9 litres with 5% waste — two 5 litre cans.

Spread rate is the sensitive variable. On absorbent new plaster the same job could need 12–14 litres. Prime new work rather than letting the first coat of finish paint do the priming.

4. Flooring packs

A 20 m² room with 10% waste needs 22 m². At 2.2 m² per pack that is exactly 10 packs. Add underlay by the roll and skirting by the length, allowing 10% on the perimeter for mitres and offcuts. Buy the whole quantity in one batch to avoid shade variation.

5. Drywall and jointing

For 80 m² using 1200 × 2400 boards (2.88 m² each) with 10% waste: 88 m² ÷ 2.88 = 31 boards. Framing a 20 m run at 600 mm centres needs 35 studs. Consumables: about 930 screws, 120 m of tape and 96 kg of jointing compound — five 20 kg bags.

6. Roofing and pitch

A 12 × 8 m footprint is 96 m² on plan. At 30° the roof surface is 96 ÷ cos 30° = 111 m². With 10% waste that is 122 m² of covering. At 0.1 m² per tile, 1,220 tiles. Underlay at 30 m² per roll: 5 rolls. Battens at 300 mm spacing: about 407 linear metres.

7. Waste factors

Waste is not padding — it is the material that physically cannot end up on the wall or floor. Cuts at edges, breakage in handling, offcuts too small to use, and the spare you keep for repairs. Ten percent is the usual starting point for simple rectangular work. Complex layouts, small rooms with many cuts, diagonal and herringbone patterns, and large format tiles all justify more.

The one rule worth following regardless: buy the whole quantity, including waste and spares, in a single batch. Colour and shade vary between production runs on tiles, flooring, paint and roof coverings alike, and a later top-up rarely matches.

All consumption figures on this site are typical industry values, not manufacturer specifications. Substrate condition, trowel technique, temperature and the specific product all shift real coverage. Check the datasheet on what you actually buy, and treat these results as a purchasing plan to verify rather than a guarantee. Nothing here is a substitute for a professional take-off on a job of any size.

BuildCalc — six metric construction calculators with adhesive, grout and cost included. Every formula verified against worked examples.

© 2026 BuildCalc · Estimating aid — always verify against product datasheets